|
Prior to the
devolution of resources consequent on transfer of functions
and powers to the local governments in the light of the
Kerala Panchayat Raj Act, 1994, and the Kerala Municipality
Act, 1994, the local works wing of the Kerala PWD and the
engineering staff from the PWD working in the Rural Development
Board respectively were carrying out construction works
on behalf of the Village Panchayats and the Community Development
Blocks. Consequent on the devolution of powers and resources,
the services of the above staff became inadequate. The token
deployment of a PWD Division and a Minor Irrigation Section
to the respective District Panchayats and other ad hoc arrangements
since 1995 were not sufficient particularly since the local
governments did not have any control over them. Thus there
was a crying need for having own engineers at the disposal
of the local governments, working under their direction
and control. The redeployment of engineers was recommended
by the Sen Committee on the basis of this need.
The engineering
staff from the PWD and the WRD from Superintending Engineers
to Assistant Executive Engineers were deployed vide G.O.(MS).No.16/2003/LSGD
dt. 09.01.03 and the Assistant Engineers vide G.O.(P).No.31/2003/LSGD
dt. 29.01.03. The Overseers were deployed vide G.O.(P).No.33/2003/LSGD
dt. 31.01.03.
After the above
orders, a lot of deployments, transfers and postings have
taken place and now the notional LSGD Engineering Cadre,
under the control of the LSGD in the Secretariat, is a full
fledged one headed by the Chief Engineer, LSGD.
|
|
|
|